Volante Tower

Special Feature: 

The 12.0 meter long span floor is constructed with a 300mm post-tension slab. Two columns are merged in one floor, thus achieving the transfer of two edge columns and avoiding any obstruction to the driveway on the parking level (walking columns concept).

Special Feature of e.construct Service: 
In order to create a cost-efficient and time-efficient solution, e.Construct developed an optimum structural concept that reduces the floor slab cycle. Various schemes were investigated, with priority given to the following factors: - Sound engineering solution that reflects the client’s objectives and regulatory standards - Economical efficiency - Added value product that exceeds the client expectations - Build ability - Construction speed - Accommodation of architectural requirements - Adaptability for the provision of service.
Construction Photos
Architectural Render

Value Engineering

Before
After
Search Projects